The rapidization renovation project of the West Second Ring Road (from North Second Ring Road to Fanwa Road) is located in Shushan District and Luyang District. It mainly involves the rapidization renovation of the existing West Second Ring Road. It is planned as an urban expressway with a red line width of 70 meters and a total renovation length of approximately 5.1 kilometers. This section is Section 1 (from Changjiang West Road to 180m north of Nanfei River). The starting point of the main line bridge is K1+257.331 north of Fanwa Road, and the ending point is K2+798.331, with a total length of 1,541 meters. Both the mainline bridge and the ramp bridge in this section include some steel structure continuous box girders, among which the mainline bridge of the West Second Ring Road has a total of 7 steel box girders. There are a total of 8 steel box girders for the ramp bridge of Qingxi Road Interchange.